Par heikampg213455
11 octobre 2021
Ayman verbally quoted $3,000 to $4,000 to "maintain" our stone sidewalk. This required lifting the existing stone, leveling the sand below and putting the existing stone back in place. When he was finished he wanted $8,000 for 37 hours of work.
>
Signaler
Vous êtes le proprio? Répondez ou Contactez PJ